Close Go back Collapse all sections
Process Data set: BontexGeo geosynthetics (H) (en) en da

A more recent version of this data set exists in the database.

Most recent version of this data set:00.01.003

Key Data Set Information
Location RER
Reference year 2021
Name
BontexGeo geosynthetics (H)
General comment on data set Produced at the BontexGeo factory in Hungary. The product is used in civil engineering applications such as such as roads, railways, landfills, tunneling, coastal protection with the main functions filtration, separation, reinforcement, drainage, and protection.
Copyright Yes
Owner of data set
Quantitative reference
Reference flow(s)
Time representativeness
Data set valid until 2026
Technological representativeness

Indicators of life cycle

 Indicator Direction Unit  Production
A1-A3
  Transport
A4
  Installation
A5
  Use
B1
  Maintenance
B2
  Repair
B3
  Replacement
B4
  Refurbishment
B5
  Operational energy use
B6
  Operational water use
B7
  De-construction
C1
  Transport
C2
  Waste processing
C3
  Disposal
C4
Recycling Potential
D
Input
  • 3.97E+3
  • 77.1
  • 6.31
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0.478
  • 6.42
  • 0
  • 72.9
  • -342
Input
  • 633
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 4.6E+3
  • 77.1
  • 6.31
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0.478
  • 6.42
  • 0
  • 72.9
  • -342
Input
  • 8.72E+4
  • 1.34E+3
  • 41.1
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 8.3
  • 112
  • 0
  • 1.04E+3
  • -804
Input
  • 4.44E+4
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 1.32E+5
  • 1.34E+3
  • 41.1
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 8.3
  • 112
  • 0
  • 1.04E+3
  • -804

 Indicator Unit  Production
A1-A3
  Transport
A4
  Installation
A5
  Use
B1
  Maintenance
B2
  Repair
B3
  Replacement
B4
  Refurbishment
B5
  Operational energy use
B6
  Operational water use
B7
  De-construction
C1
  Transport
C2
  Waste processing
C3
  Disposal
C4
Recycling Potential
D
  • 8.23
  • 0.368
  • 0.0249
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0.00316
  • 0.03
  • 0
  • 0.219
  • -0.107
  • 9.2E-9
  • 1.84E-14
  • 2.4E-8
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 1.14E-16
  • 1.53E-15
  • 0
  • 1.64E-13
  • -8.43E-13
  • 0.0539
  • 0.000304
  • 0.0000113
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0.00000189
  • 0.0000254
  • 0
  • 0.0132
  • -0.00015
  • 1.66
  • 0.166
  • 0.00828
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0.00146
  • 0.0137
  • 0
  • 0.0486
  • -0.0255
  • 17.8
  • 1.85
  • 0.11
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0.0162
  • 0.153
  • 0
  • 0.533
  • -0.267
  • 6.97
  • 0.326
  • 0.022
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0.0041
  • 0.0267
  • 0
  • 0.158
  • -0.0693
  • -93.8
  • 1.07
  • 72.2
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • -0.0283
  • 0.0895
  • 0
  • -2.2
  • 0.0424
  • 2.34E+3
  • 99.1
  • 36.4
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0.645
  • 8.23
  • 0
  • 72.4
  • -50.2
  • 0.661
  • 0.809
  • 0.00434
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0.00501
  • 0.0674
  • 0
  • 0.0588
  • -0.0682
  • 2.25E+3
  • 101
  • 109
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0.622
  • 8.39
  • 0
  • 70.2
  • -50.3
  • 1.56E+3
  • 0.975
  • 12.5
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0.00604
  • 0.0812
  • 0
  • -0.812
  • -9.32

 Indicator Unit  Production
A1-A3
  Transport
A4
  Installation
A5
  Use
B1
  Maintenance
B2
  Repair
B3
  Replacement
B4
  Refurbishment
B5
  Operational energy use
B6
  Operational water use
B7
  De-construction
C1
  Transport
C2
  Waste processing
C3
  Disposal
C4
Recycling Potential
D
1This impact category deals mainly with the eventual impact of low dose ionizing radiation on human health of the nuclear fuel cycle. It does not consider effects due to possible nuclear accidents, occupational exposure nor due to radioactive waste disposal in underground facilities. Potential ionizing radiation from the soil, from radon and from some construction materials is also not measured by this indicator.
2The results of this environmental impact indicator shall be used with care as the uncertainties on these results are high or as there is limited experiences with the indicator.
Potential Comparative Toxic Unit for ecosystems (ETP-fw) 2
  • 1.87E+4
  • 1E+3
  • 22.4
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 6.19
  • 83.1
  • 0
  • 1.02E+3
  • -318
Potential Comparative Toxic Unit for humans - cancer effects (HTP-c) 2
  • 0.00000203
  • 2.07E-8
  • 1.29E-9
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 1.28E-10
  • 1.72E-9
  • 0
  • 4.63E-8
  • -9.44E-9
Potential Comparative Toxic Unit for humans - non-cancer effects (HTP-nc) 2
  • 0.0000174
  • 0.0000012
  • 1.02E-7
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 7.49E-9
  • 1E-7
  • 0
  • 0.0000037
  • -3.8E-7
Potential Human exposure efficiency relative to U235 (IRP) 1
  • 179
  • 0.364
  • 0.221
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0.00226
  • 0.0303
  • 0
  • 1.78
  • -16.7
Potential Soil quality index (SQP) 2
  • 8.96E+3
  • 468
  • 9.25
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 2.9
  • 39
  • 0
  • 72.5
  • -422
Potential incidence of disease due to PM emissions (PM) 2
  • 0.0000977
  • 0.0000022
  • 1.78E-7
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 3.56E-8
  • 1.72E-7
  • 0
  • 0.00000214
  • -8.92E-7