Close Go back Collapse all sections
Process Data set: HUILITONG Steel Hollow Sections (en) en

A more recent version of this data set exists in the database.

Most recent version of this data set:00.03.000

Key Data Set Information
Location CN
Reference year 2025
Name
HUILITONG Steel Hollow Sections
Technical purpose of product or process HUILITONG steel hollow sections are used in petroleum and natural gas transportation, water transportation, and mineral powder transportation, and also used in steel pipe and pile steel pipe for industrial and civil building structures. They can be electric resistance welded pipes, spiral submerged arc welded pipes, square and rectangular pipe.
General comment on data set Declare unit: One ton of HUILITONGsteel hollow sections.
Copyright Yes
Owner of data set
Quantitative reference
Reference flow(s)
Material properties of the reference flow
    • weight per piece: 1000.0 kg
Biogenic carbon content
  • Carbon content (biogenic): 0.0 kg
  • Carbon content (biogenic) - packaging: 0.0 kg
Time representativeness
Data set valid until 2030
Technological representativeness
Technology description including background system Electric Resistance Welded Pipes (ERW) and Spiral Submerged Arc Welded Pipes (SSAW). For **ERW pipes**: The process begins with uncoiling, strip steel flattening and top cropping, followed by shear welding, spiral looper and molding. The formed pipe undergoes induction welding, removal of inside and outside weld burrs, weld heat treatment, cooling, sizing and straightening, and sawing. Subsequent quality control steps include appearance inspection, sampling, flattening test, flat-end chamfering, hydrostatic test, and inspection of the pipe body and weld seam. After length measuring and weighing and marking, the finished pipes are packed and warehoused. For **SSAW pipes**: Production starts with soft material inspection, uncoiling and initial correction. After butt welding of top crops, fine correction and trimming, the strip is delivered for forming and inside-outside submerged arc welding. The welded pipes go through weld seam and external inspection, repair welding, X‑ray, radiography and manual ultrasonic inspection, as well as groove processing. Hydrostatic testing, automatic length measuring and weighing are then carried out. Finally, the pipes are marked and transferred to the warehouse.

Indicators of life cycle

IndicatorDirectionUnit Production
A1-A3
Transport
A4
Installation
A5
Use
B1
Maintenance
B2
Repair
B3
Replacement
B4
Refurbishment
B5
Operational energy use
B6
Operational water use
B7
De-construction
C1
Transport
C2
Waste processing
C3
Disposal
C4
Recycling Potential
D
Input
  • 1.85E+4
  • 148
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 26.6
  • 138
  • 1.42
  • -2.39E+3
Input
  • 0.19
  • 0
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0
  • 0
  • 1.5E+2
  • 0
Input
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
Input
  • 2.36E+3
  • 21.5
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 3.61
  • 29.2
  • 0.216
  • 595
Input
  • 0
  • 0
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 0
  • 0
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 0
  • 0
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 0
  • 0
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 0
  • 0
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 0
  • 0
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 0
  • 0
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 0
  • 0
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 3.14
  • 0
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 1.85E+4
  • 148
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 26.6
  • 138
  • 1.42
  • -2.39E+3
Input
  • 45.4
  • 0
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0
  • 8.5E+2
  • 0
  • 0
Input
  • 25.2
  • 0.218
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0.0372
  • 0.153
  • 0.0239
  • -1.98
Input
  • 2.36E+3
  • 21.5
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 3.61
  • 29.2
  • 0.216
  • 595
Input
  • 0
  • 0
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0
  • 0
  • 0
  • 0

IndicatorUnit Production
A1-A3
Transport
A4
Installation
A5
Use
B1
Maintenance
B2
Repair
B3
Replacement
B4
Refurbishment
B5
Operational energy use
B6
Operational water use
B7
De-construction
C1
Transport
C2
Waste processing
C3
Disposal
C4
Recycling Potential
D
  • 1.85E+4
  • 148
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 26.6
  • 138
  • 1.42
  • -2.39E+3
  • 0.0159
  • 0.000321
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0.0000627
  • 0.000441
  • 0.00000147
  • -0.00375
  • 11.1
  • 2.76
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0.081
  • 0.347
  • 0.00665
  • -0.531
  • 0.0000144
  • 0.00000231
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 2.88E-7
  • 6.25E-7
  • 2.71E-8
  • 0.0000106
  • 1.03
  • 0.00849
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0.00152
  • 0.0112
  • 0.0000779
  • -0.122
  • 2.52
  • 0.724
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0.0295
  • 0.137
  • 0.00253
  • -0.11
  • 26.1
  • 8.02
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0.322
  • 1.22
  • 0.0277
  • -2.33
  • 1.34
  • -0.0242
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0.000572
  • 36.7
  • 0.000129
  • 0
  • 2.64E+3
  • 158
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 19.4
  • 52.3
  • 0.938
  • -102
  • 1.4
  • 0.0737
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0.0078
  • 0.116
  • 0.000483
  • 0.483
  • 2.65E+3
  • 158
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 19.4
  • 89.1
  • 0.939
  • -102
  • 9.13
  • 2.27
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 0.112
  • 0.39
  • 0.00991
  • -0.718
  • 805
  • 7.08
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • 0
  • 1.23
  • 4.99
  • 1.01
  • -47.6

IndicatorUnit Production
A1-A3
Transport
A4
Installation
A5
Use
B1
Maintenance
B2
Repair
B3
Replacement
B4
Refurbishment
B5
Operational energy use
B6
Operational water use
B7
De-construction
C1
Transport
C2
Waste processing
C3
Disposal
C4
Recycling Potential
D
1This impact category deals mainly with the eventual impact of low dose ionizing radiation on human health of the nuclear fuel cycle. It does not consider effects due to possible nuclear accidents, occupational exposure nor due to radioactive waste disposal in underground facilities. Potential ionizing radiation from the soil, from radon and from some construction materials is also not measured by this indicator.
2The results of this environmental impact indicator shall be used with care as the uncertainties on these results are high or as there is limited experiences with the indicator.
Potential Comparative Toxic Unit for ecosystems (ETP-fw) 2
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
Potential Comparative Toxic Unit for humans - cancer effects (HTP-c) 2
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
Potential Comparative Toxic Unit for humans - non-cancer effects (HTP-nc) 2
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
Potential Human exposure efficiency relative to U235 (IRP) 1
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
Potential incidence of disease due to PM emissions (PM) 2
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
Potential Soil quality index (SQP) 2
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND
  • ND