| Key Data Set Information | |||
| Location | CN | ||
| Reference year | 2025 | ||
| Name |
| ||
| Technical purpose of product or process | HUILITONG steel hollow sections are used in petroleum and natural gas transportation, water transportation, and mineral powder transportation, and also used in steel pipe and pile steel pipe for industrial and civil building structures. They can be electric resistance welded pipes, spiral submerged arc welded pipes, square and rectangular pipe. | ||
| General comment on data set | Declare unit: One ton of HUILITONGsteel hollow sections. | ||
| Copyright | Yes | ||
| Owner of data set | |||
| Quantitative reference | |||
| Reference flow(s) |
| ||
| Biogenic carbon content |
| ||
| Time representativeness | |||
| Data set valid until | 2030 | ||
| Technological representativeness | |||
| Technology description including background system | Electric Resistance Welded Pipes (ERW) and Spiral Submerged Arc Welded Pipes (SSAW). For **ERW pipes**: The process begins with uncoiling, strip steel flattening and top cropping, followed by shear welding, spiral looper and molding. The formed pipe undergoes induction welding, removal of inside and outside weld burrs, weld heat treatment, cooling, sizing and straightening, and sawing. Subsequent quality control steps include appearance inspection, sampling, flattening test, flat-end chamfering, hydrostatic test, and inspection of the pipe body and weld seam. After length measuring and weighing and marking, the finished pipes are packed and warehoused. For **SSAW pipes**: Production starts with soft material inspection, uncoiling and initial correction. After butt welding of top crops, fine correction and trimming, the strip is delivered for forming and inside-outside submerged arc welding. The welded pipes go through weld seam and external inspection, repair welding, X‑ray, radiography and manual ultrasonic inspection, as well as groove processing. Hydrostatic testing, automatic length measuring and weighing are then carried out. Finally, the pipes are marked and transferred to the warehouse. | ||
| Subtype | specific dataset | ||||
| LCA methodology report | |||||
| Data sources, treatment and representativeness | |||||
| Documentation of data quality management | |||||
| Data source(s) used for this data set | |||||
| Completeness | |||||
| Validation | |||||
| |||||
| Compliance Declarations | |||||
| Compliance |
Compliance system name
|
Approval of overall compliance
|
Nomenclature compliance
|
Methodological compliance
|
Review compliance
|
Documentation compliance
|
Quality compliance
|
| Commissioner and goal | |
| Commissioner of data set | |
| Data generator | |
| Data set generator / modeller | |
| Data entry by | |
| Time stamp (last saved) | 2026-11-17T14:51:43.923527+08:00 |
| Data set format(s) | |
| Publication and ownership | |
| UUID | 04241f78-cf22-45fa-8ac9-34d6ce51081f |
| Date of last revision | 2026-11-17T14:51:43.923577+08:00 |
| Data set version | 00.01.000 |
| Registration authority | |
| Registration number | EPD-CN-00021 |
| Owner of data set | |
| Copyright | Yes |
| License type | Free of charge for some user types or use types |
| Access and use restrictions | None |
Indicators of life cycle